1.A chamber of post combustion of gasesA burner of combustion of gases,A device of injection of air allowing a total re-combustion of gases,A device of air inlet of cooling of waste gases,A sheath of evacuation of the gases burnt,Carcass in strong sheet steel with support of connectionComposition of the refractory;Refractory concrete:Thickness :>150mmNature: 65%% of Al203Insulate in fibrous panels:Thickness: >85mmNature: CalciumBurner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.A secondary injection of air to ensure perfect oxygen content.2.A control box ensuring the complete cycle of combustion.3.Fan:Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.4.Controls and regulations:Control box watertight to dust, including:A switch circuit breaker for each engine (ventilators and burners).A timer with adjustable temporization for the regulation of each burner.A regulator with digital watching for the temperature of combustion.A regulator with digital watching for the temperature of post-combustion.Electric box.5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing.6.Process filtering system: scrubber to be mentioned as optional7.Emission standards compliance: BS 3316 or equivalent standard8.Capacity to treat plastic: not less than 40% by weight9.CE manufacturing compliance: BS EN 746-2-1997

Medical Incineraotors chamber of post combustion
1.A chamber of post combustion of gasesA burner of combustion of gases,A device of injection of air allowing a total re-combustion of gases,A device of air inlet of cooling of waste gases,A sheath of evacuation of the gases burnt,Carcass in strong sheet steel with support of connectionComposition of the refractory;Refractory concrete:Thickness :>150mmNature: 65%% of Al203Insulate in fibrous panels:Thickness: >85mmNature: CalciumBurner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.A secondary injection of air to ensure perfect oxygen content.2.A control box ensuring the complete cycle of combustion.3.Fan:Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.4.Controls and regulations:Control box watertight to dust, including:A switch circuit breaker for each engine (ventilators and burners).A timer with adjustable temporization for the regulation of each burner.A regulator with digital watching for the temperature of combustion.A regulator with digital watching for the temperature of post-combustion.Electric box.5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing.6.Process filtering system: scrubber to be mentioned as optional7.Emission standards compliance: BS 3316 or equivalent standard8.Capacity to treat plastic: not less than 40% by weight9.CE manufacturing compliance: BS EN 746-2-1997

Incinerator Operating period Anticipated daily period 8 hours
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating : at least 450kw/hour…

Incinerator Operating period Anticipated daily period 8 hours
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating : at least 450kw/hour…

a complete destruction of waste from various hospital services
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. …

a complete destruction of waste from various hospital services
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. …

Incinerator Rated Capacity: 100/KG/Hr
Incinerator Rated Capacity: 100/KG/Hr Type of Design: Double Chambered Mode of Heating: Heating Elements Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) Electrical Supply :3 Phase 440 Volt Control Panel MOC: Mild Steel Power Coated No. of Temp: Controllers : 2 Nos Details: The Control Panel will be provided with contract as relays , switches , indicators etc . Operative on 3 phase. I.D.Fan Type: Centrifugal Type MOC: Mild Steel…

Incinerator Rated Capacity: 100/KG/Hr
Incinerator Rated Capacity: 100/KG/Hr Type of Design: Double Chambered Mode of Heating: Heating Elements Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) Electrical Supply :3 Phase 440 Volt Control Panel MOC: Mild Steel Power Coated No. of Temp: Controllers : 2 Nos Details: The Control Panel will be provided with contract as relays , switches , indicators etc . Operative on 3 phase. I.D.Fan Type: Centrifugal Type MOC: Mild Steel…

Design standard Multiple chamber incinerator
Waste type organics domestical waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance…

Design standard Multiple chamber incinerator
Waste type organics domestical waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance…

Pig corpses / stray dogs and larger animal carcasses
Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr. 2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… 4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste. 6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds. The incineration should be completely free from visible smoke as well as offensive odours. 9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter 11. The Volume of the combustion chamber: Not Less Than 2.3 M³ 12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel…

Pig corpses / stray dogs and larger animal carcasses
Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr. 2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… 4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste. 6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds. The incineration should be completely free from visible smoke as well as offensive odours. 9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter 11. The Volume of the combustion chamber: Not Less Than 2.3 M³ 12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel…

Mobile Diesel Fired Incinerator in container
Mobile Diesel Fired Incinerator in container, supplied with the following specifications: complete with constant ventilation fans for extraction, factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping. Fully containerised mobile waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner b. Dedicated independent fan system, damper controlled. …

Mobile Diesel Fired Incinerator in container
Mobile Diesel Fired Incinerator in container, supplied with the following specifications: complete with constant ventilation fans for extraction, factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping. Fully containerised mobile waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner b. Dedicated independent fan system, damper controlled. …

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ
ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75 كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات BIO MEDICAL INCENERATOR BIO MEDICAL INCENERATOR PLANT Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc. CAPACITY :- 200BEDS. Operation and Maintenance Manual As built Drawing in 3 set hard copy + Soft copy in Cad Testing and Commissioning Note: The drawings are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health make a room for the incinerator that accommodate three incinerators as in item 3.1.1 and attached to the incinerator room waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with preparingg incinerator building and store with all the work of wiring, electrical and lighting systems, water supply and sanitation supply incinerator building and the waste warehouse with a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and this system is linked with the hospital fire alarm systems …

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ
ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75 كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات BIO MEDICAL INCENERATOR BIO MEDICAL INCENERATOR PLANT Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc. CAPACITY :- 200BEDS. Operation and Maintenance Manual As built Drawing in 3 set hard copy + Soft copy in Cad Testing and Commissioning Note: The drawings are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health make a room for the incinerator that accommodate three incinerators as in item 3.1.1 and attached to the incinerator room waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with preparingg incinerator building and store with all the work of wiring, electrical and lighting systems, water supply and sanitation supply incinerator building and the waste warehouse with a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and this system is linked with the hospital fire alarm systems …

new hospital waste treatment plant
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world. We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating. Please send me all general information and quotes for machines of all ranges that could meet our needs. Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to dioxins and furals as well as lists of recommendations from past clients. If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use. Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance. Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg

new hospital waste treatment plant
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world. We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating. Please send me all general information and quotes for machines of all ranges that could meet our needs. Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to dioxins and furals as well as lists of recommendations from past clients. If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use. Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance. Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg

islands incinerators
Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr) 25 kg primary chamber 800 degree secondary chamber 1000 degree chimney standard shredder…

islands incinerators
Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr) 25 kg primary chamber 800 degree secondary chamber 1000 degree chimney standard shredder…