biohazard waste disposal guidelines

biohazard waste disposal guidelines

biohazard waste disposal guidelines 1. The ground should be flat when install the incinerator. There should be 100cm at least between the incinerator  and the walls on the two sides and the back, which is in convenient maintenance and repair. 2.  A), Place the incinerator main body(combustion chamber) and fixed with bolts and Asbestos tape. B), Place the wet scrubber system and fixed with bolts and Asbestos tape. C). Install chimneys and fixed with bolts, Asbestos tape and Steel Rope. D). Fix the incineration house roof. E). Fix burner, blower, wind tube, electric system, fuel system. 3. Check the electric wire: the incinerator’s electric circuit should be linked with the ground wire to guard against current leakage.  The link-up of the electric wire should be checked carefully before starting the incinerator, in case of wrong link-up or leakage. 4. Check of the fuel supply system: Except the Burner’s soft pipe which is used for the fuel flowing-in and flowing-back, all the rest pipes must use brass or steel pipe. No leakage is allowed at pipe junctions. Any leakage should be blocked in time. 5. Install steel rope with the chimney, to avoid tilt by wind.  6. Install net cover at the blower, to avoid sundries. 7. If the fuel is Natural Gas with gas burner, please contact with local administration section and install gas supplier system. 8. Crane or forklift is necessary when download/upload/install incinerator.  9. Topped work house roof after installation. 10.Get the video material: http://www.eclover.net/category/incinerator-video/     Nanjing…

Refractory constructions incinerator

Refractory constructions incinerator

* Burning Rate                                                     (50-120kg/hour)* Minimum Operating Temperature                (850°ϲ(Primary combustion)* Maximum Operating Temperature               (1450°ϲ(Afterburner chamber)* Secondary Burning Capacity                         (Compulsory)* Density Insulation                                           (20mm high)* Refractory Casting                                          (Minimum 65mm)* Heavy duty refracting lining to withstand    (1500°ϲ)* Average burn out time: Maximum                (3.0 hours)* Fuel Type                                                          (Diesel)* Fuel Consumption in L/hr:                            (7.5 to 9)* Residence time in secondary chamber     (2 sec.)* Residue ash post 100kg                               (Max. 3.8kg)* Installation period                                            (Maximum 7days)Type : Refractory constructionsSteel Structure 400+ Silica board + Fire Brick andCastable betweenSize : Outside – W 740 x L 1112 x H 790 / Inside – W 400 x L 800 x H 560 (mm)Fire load of Combustion volume : 0.18 m3Fire table area : 0.32 m2Material : SS400 x 6.0T, Silica Board, Fire Brick (SK-36), Castable (HACT-160)Temperature : 700 ~ 900 ℃Residual gas combustion in secondary chambers : ≥ 2secInput door size : W 200 x H 200 (mm)Ash door size : W 300 x H 400 (mm)Type : Refractory constructionsSteel Structure 400+ Silica board + Fire Brick and Castable betweenSize : Outside – W 740 x L 1112 x H 745 / Inside – W 400 x L 800 x H 600 (mm)  Fire load of Combustion volume : 0.19 m3  Fire table area : 0.32 m2Material :  SS400 x 6.0T, Silica Board 50T, Fire Brick (SK-36), Castable (HACT-160) Temperature : 1000 ~ 1100 ℃ WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate…

Incinerator Primary Combustion Chamber

Incinerator Primary Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with other disposal methods.Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201   Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com  

Incinerator Primary Combustion Chamber

Incinerator Primary Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with other disposal methods.Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201   Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com  

MEDICAL WASTE INCINERATOR (50 C 60kg/hr)

MEDICAL WASTE INCINERATOR (50 C 60kg/hr)

Medical Waste Incinerator, 50 to 60 Kg/hrSupport Health Sector Support ProjectPoint of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals1.    General DescriptionSupply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment.  The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006).  The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.  The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour.  It shall be constructed from mild or aluminized steel lined with refractory material.Main unit Application For incineration, general and pathologicalCapacity   50 C 60 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%    3.2     Primary ChamberConstruction Constructed from heavy duty mild or aluminized  steel Orequal and approved equivalentInsulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottomand charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings   ProvidedLoading Manual loading of wastePrimary Burner                        Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted                                                                                                    Blower Provided. For supplying excess combustion air through the distribution system with speed control systemTemperature…

MEDICAL WASTE INCINERATOR (50 C 60kg/hr)

MEDICAL WASTE INCINERATOR (50 C 60kg/hr)

Medical Waste Incinerator, 50 to 60 Kg/hrSupport Health Sector Support ProjectPoint of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals1.    General DescriptionSupply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment.  The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006).  The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.  The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour.  It shall be constructed from mild or aluminized steel lined with refractory material.Main unit Application For incineration, general and pathologicalCapacity   50 C 60 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%    3.2     Primary ChamberConstruction Constructed from heavy duty mild or aluminized  steel Orequal and approved equivalentInsulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottomand charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings   ProvidedLoading Manual loading of wastePrimary Burner                        Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted                                                                                                    Blower Provided. For supplying excess combustion air through the distribution system with speed control systemTemperature…

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature:  1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                      Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories:  All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system  50HZ   Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.  Supplier shall provide the following documentation    User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators.   Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and  pictures of the incinerators to be installed  Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature:  1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                      Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories:  All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system  50HZ   Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.  Supplier shall provide the following documentation    User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators.   Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and  pictures of the incinerators to be installed  Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%Construction Constructed from heavy duty mild or aluminized  steelOr equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings    ProvidedLoading Manual loading of wastePrimary Burner                        Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type                                               Flange mountedBlower   Provided.  3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type     3.3    Secondary chamber